Description of Service
PAY INVOICE INV-ART-000627
Floor installation and Plumbing services
Scope of Work
Technicians arrived on site and removed the bathroom concrete floor. The new plumbing lines were reinstalled and the concrete floor was poured. The first floor was conditioned and the tiles were installed.
Technicians cleaned the work area after finishing.
Materials & Labor
Concrete Mesh 1
Rebar 1
Anchoring epoxy 1
60′ Pex pipe 1
Fittings 25
Wall pipe anchoring 4
Technicians making the repairs 1
Extras (Waved) 1