Technician arrived on site and installed a new garbage disposal, connected the drain lines and tested it. The breaker box cover was removed in order to fix the wall, technician covered the damage sections with drywall, applied the joint mesh and joint compound, the area was finished and painted. Technician also inspected the air conditioning system and set it to a comfortable temperature. The work are was cleaned after finishing. Job completed on 06/28/2022
Material:
Garbage disposal 1
Joint mesh 1
Joint compound 1
Drywall 1
Labor:
Technician making the repairs