407 371 9447 info@artsolutions4all.com
P.O Box 677932Orlando FL 32867

SRV-MR-04172023-03 – Description

$13,884.58

Handyman

Category:

Description of Service

INVOICE INV-ART-000589

Handyman

Scope of Work

Technicians arrived on site and removed the old siding, storm shutters, windows, doors, soffit, lamps, wires, gutter, trims, and parts of the damaged frames. New insulation was installed on the area where the door was replaced by a window. New pressure treated lumber was used to replace the damaged sections of the frame. The TV wires were concealed inside the walls. New pressure treated plywood, moisture barrier home wrap, new windows, and doors were installed. Flashing tape was installed round windows and door frames. The new cement boards siding was installed, and all the joints were sealed with siliconized acrylic latex caulk, covered with cement board joint mesh, and finished with mildew resistant mortar. All the trims were installed, and the new siding and teims were protected with waterproofing sealer prior to the paint process. All the necessary repairs were made to the remaining old siding. The house was pressure washed, and the walls, doors, and trims were painted as well as the gutters. The new gutter sections were installed, and the existing gutters on the other side of the house were reinstalled after painting them. The wiring was relocated on the inside of the house, a new lamp was installed on the outside, and all the necessary electrical junction boxes and new wiring were installed. The moldings and trims were installed on the inside, and all the affected walls were finished. Technicians cleaned the work area after finishing and disposed of all the demolished debris off-site.

Materials & Labor

5″ HIDDEN HANGER W/SCREW 30 $2.59 $- $77.70
5″ L ENDCAP 1 $2.11 $- $2.11
5″ R ENDCAP 1 $2.11 $- $2.11
5″X10′ .019 ALUM GUTTER – WHITE 6 $13.49 $- $80.94
5″ ALUM SEAMER – WHITE (2-PK) 3 $7.27 $- $21.81
Down Spout Band 12 $1.44 $- $17.28
8 x 1/2″ White-Stainless-Steel Screw-25-Pack 2 $6.36 $- $12.72
3X4 Down Spout 3 $19.15 $- $57.45
A FRONT ELBOW 9 $5.05 $- $45.45
Commercial grade cement panel siding 14 $- $- $-
Adhesive Cement Board Tape 2 $9.52 $- $19.04
Backer-OnBACKER-ON SCREW 9X1-5/8″ 1 $35.01 $- $35.01
4″ Exterior Screws 1 $10.62 $- $10.62
2″ Exterior Screws 1 $10.62 $- $10.62
2 1/2″ Exterior Screws 1 $10.62 $- $10.62
3 1/2″ Exterior Screws 1 $10.62 $- $10.62
DECKMATE III, TAN, 1-5/8 IN, 5 LB 1 $37.24 $- $37.24
55 lbs. Mortar Mix 1 $19.14 $- $19.14
HardieTrim 16 $17.54 $- $280.64
1x4x12 PT Lumber 5 $6.79 $- $33.95
2x4x8 PT Lumber 5 $6.37 $- $31.85
Mildew-Resistant Stucco 4 $13.39 $- $53.56
4X8X1/2 PT Plywood 13 $38.85 $- $505.05
2x10x8 Lumber 1 $10.91 $- $10.91
Window and Door Flashing Tape 4 $27.07 $- $108.28
HomeWrap Housewrap Installation Tape 2 $15.60 $- $31.20
Tivek Home Wrap 1 $169.34 $- $169.34
32 in. x 80 in. Premium Fan Exterior Door 3 $316.31 $- $948.93
36 in. x 80 in. Premium Clear 1/2-Lite Mini-Blind Exterior Door 1 $495.23 $- $495.23
S/O AC 70 FLORIDA SH Low-E Argon White Vinyl Window 5 $601.14 $- $3,005.70
Waterproffing sealer 3 $47.93 $- $143.79
Premium exterior Paint P480-4 RUSHING STREAM 9 $47.93 $- $431.37
Insulation 1 $39.41 $- $39.41
Premium exterior Paint P480-4 RUSHING STREAM 6 $47.93 $- $287.58
Paint Spray Black 3 $6.90 $- $20.70
Siliconized Acrylic Latex Caulk 20 $5.48 $- $109.60
Shrink Free Spackling 1 $26.63 $- $26.63
ScotchBlue Original Multi-Surface Painter’s Tape 6 $5.48 $- $32.88
1-1/4 in. x 8 ft. Galv Corner Bead 1 $3.77 $- $3.77
Finished Trim Molding 5/8 X 2-1/4 X 7 DPK 2 $49.88 $- $99.76
4.5 gal. UltraLightweight Ready-Mixed Joint Compound 3 $22.37 $- $67.11
1/2 in. x 4 ft. x 8 ft. UltraLight Drywall 2 $16.58 $- $33.16
 Mesh Drywall Joint Tape 1 $13.10 $- $13.10
14/3 Solid Romex Wire 1 $78.58 $- $78.58
14/2 Solid Romex Wire 1 $60.18 $- $60.18
Electric Juction Box 4 $1.90 $- $7.60
4 in. 1-1/2 in. Electric Deep Octagon Box 2 $4.24 $- $8.48
4 in. Electric Deep Octagon Cover Flat 2 $1.38 $- $2.76
Disposal Fee 1 $- $- $-
Pressure Washer Fees 1 $- $- $-
Material Delivery Fee 1 $- $- $-
Labor (Project Duration: 22 Days) 469 $17.00 $- $7,973.00
Hours Adjustmet 100 $(17.00) $- $(1,700.00)
Trip Charge 1 $- $- $-
Total Materials $7,611.58
Total Labor $6,273.00