Description of Service

INV-ART-000413 – Total Cost: 380.00 USD
Scope of Work: Technician arrived on site and checked in with site manager to address the fence issue. Technician completed assessment by removing the damaged fence section including the damaged post, technician dug a hole to secure the new post and secured the new post with Fast-setting high strength concrete, the remaining new parts of the fence were installed and secured. Technician cleaned work area and checked out with store manager.

Materials & Labor:

4′ Black Wire Commercial Grade Fabric Qty: 1
2 1/2″ x 6′ Sch 40 Black Post Qty: 1
1 5/8″ x 21′ black Commercial Rail Sch40 Qty: 1
48″ x 5/8 Tension Bar- Black Qty: 2
2 1/2 Dome Cap- Black Qty: 1
1 5/8 Black Rail End Qty: 2
Black Vinyl Coated Brace Band 2 1/2 Qty: 2
Black Vinyl Coated 2 1/2″ Tension Band Black Qty: 12
Alum Black Ties Qty: 1
Bolt and Nut 5/16 1/4 Qty: 1
Fast Setting High Strength Concrete Qty: 1
Technician repairing the fence Qty: 1

INV-ART-000414 – Total Cost: 208.00 USD
Scope of Work: Technician arrived on site and checked in with site manager to address the fence issue. Technician completed assessment by removing the damaged fence section including the damaged post, technician dug a hole to secure the new post and secured the new post with Fast-setting high strength concrete, the remaining new parts of the fence were installed and secured. Technician cleaned work area and checked out with store manager, Job Completed 07/27/2022

Materials & Labor:

Heavy-duty 2’x2’x6′ galvanized post Qty: 1
60lb Fast setting high strength concrete Qty: 2
Stainless Steel bolt with nut and washer Qty: 1
Technician repairing the sign Qty: 1