Description of Service
Scope:
Technician arrived on site and checked in with the tenant to address the bathroom lamp and the drain issue. Technician completed assessment by removing the old lamp, rearranged the wiring, and installed a new lamp. Technician also removed the drain pipes runned the cleaning line and reinstalled the drain pipes. Technician cleaned the work area and checked out with the tenant. Job completed on 01/14/22
Material:
Bathroom lamp Qty: 1
LED light bulbs Qty: 4
Labor:
Technician Labor Qty:1