Description of Service
Payment of 50% of Invoice INV-ART-000252 + Additionals for the PO AS2000038
50 Lb Ceiling Texture – Material – Quantity:3
Gal. Primer – Material – Quantity: 10
Gal. Paint – Material – Quantity: 34
Paint Supplies – Material – Quantity: 1
Popcorn removal 1,835 S/F – Material – Quantity: 1
Knockdown Texture 1,835 S/F – Material – Quantity: 1
Technicians painting walls, doors, ceiling and trims 6,781 S/F (Color change, two color walls, 1 color ceiling, one color trim, two coats) – Labor
Extras
Shower door + kit Material – Quantity: 1
Shower door instalation Labor – Quantity: 1
Family room fan+extension rod Material – Quantity: 1
Master bedroom fan Material – Quantity: 1
Fans instalation Labor – Quantity: 1
Bathroom light fixture + LED light bulbs Material – Quantity: 1
Bathroom light fixture installation Labor – Quantity: 1
Bedroom wall repair Labor – Quantity: 1
Cleaning fee Labor – Quantity: 1
(Avoid extra charges)
Client is responsible of clearing the walls, from decorations, shelves or any other items attached to it, all the rooms should be clear and the furniture relocated to the center of each room, failure to do so will result in a 3% convenience fee