Description of Service
INVOICE INV-ART-000481
Scope of Work
Technician arrived on site and checked in with the tenant to address the different items presenting issues. Technician completed assessment by reinstalling the closet doors on the linen and guest bedroom closets.
The guest bathroom threshold was reattached.
The master bathroom, towel bar, the water leak at the sink and the bathtub faucet were repaired, the bathtub faucet valves cartridges were replaced.
At the kitchen the old microwave was removed and a new microwave was installed.Technician cleaned the work area after finishing. Job completed on 10/14/22
Materials & Labor
Valve cartridge 2
Gasket kit 1
Sealer 1
Screws 1
Technician making the repairs 1