Description of Service
Scope of Works:
Technicians will arrive on site, remove the living room ceiling fan, lamp and existing floating wiring, cut two openings on the living room concrete ceiling and walls, technicians will insert electric pipes and wires, install two electrical junction boxes, close the ceiling openings with cement, close the walls openings with drywall, remove the texture from the living room ceiling, finish the damaged sections of the walls, apply new ceiling texture, prime, and paint the damaged areas, reinstall the fan and lamp. Technicians will clean the work area after finishing.
Materials:
Drywall Qty:1
Joint compound Qty: 1
Joint tape Qty: 1
Texture Qty: 1
Electrical pipes Qty: 3
Junction boxes Qty: 2
Box Tapcon screws Qty:1
Electrical straps Qty: 1
Wire Qty: 1
Primer Qty: 3
Paint Qty: 3
Labor:
Technicians making the repairs